PUMPTRACK - XGPT 103

Pumptrack areas, which are gaining popularity day by day, allow users to engage in recreational physical activity while contributing to their physical and spiritual development. Safety and quality are our most priorities during all stages: planning, construction and maintenance. We especially focus on the safety of the youngest users, so our pumptracks are also suitable for the youngest users, starting from year 2. Our pump tracks have an asphalt riding sur-face that is safe to use in almost all weather conditions. Asphalt surfaces ensure dura-bility, while maintenance is minimal. Pumptracks are more accessible than other sports infrastructure. Pumptracks can be placed on surfacesstarting from 400m2.Can be placed in the urban areas - inthe proximity of users.

Product Code: PUMPTRACK - XGPT 103

Age Range:

Safety Area: 0.00 m²

Fall Height: 0.00 m

Certificates: TS EN 1176

Activities:
  • Balance
  • Spin
  • Equality
  • Glide
  • Strength

Media
Cemer Download
Discover The Details !

View More

You can access technical drawings and many other information in this area.

Product Sheets

Product information pages provide detailed information on capacity, size, fall height, safety, materials, and functions.

Technical Specification

You can access the Technical Specification Request Form by clicking on the link below.

Anchorage Details

According to Cemer Playground Equipments, the ground surface compliant with EN standards has shock-absorbing properties and ensures safety.

After Sales

Cemer provides professional service with production and after-sales support. All products are equipped with metal tags under the Lifetime Service Warranty, making spare parts supply easy for a lifetime.

Product Overview

Detailed information about product features, environmental compatibility, and various application areas.

Product Specifications

Cemer Playground Equipment Pumptrack Course (XGPT 103) is a speed and balance-enhancing track that can be used with vehicles such as bicycles, skateboards, and scooters. It is designed with successive inclined ramps and turns that increase riding pleasure. The track has a flexible structure that can change difficulty levels for both beginners and experienced users.

Metarial Details

It is manufactured using durable high-quality concrete. These materials ensure the park's longevity while being resistant to outdoor conditions and weather conditions. The curves and slopes in the park are designed to prevent any injuries as much as possible.

Environmental Harmony and Aesthetics

Produced with environmentally friendly materials, XGPT 103 is built on a durable concrete ground. It offers a modern sports experience in both city parks and rural areas. Thanks to its simple form, it integrates without disturbing the texture of the natural environment.

Areas of Use

-School and kindergarten yards.
-Children's playgrounds.
-Parks and social recreation areas.
-Shopping mall children's play areas.

CEMER Referances

"Discover our playground references!"

Frequently Asked Questions

For more information, you can contact us at info@cemer.com.tr

What is your warranty period ?

Depending on the type of materials used, we can offer a warranty of up to 25 years on certain components. In addition, we provide technical support throughout the usage period.Steel posts come with a 25-year warranty; steel ropes and aluminum cast materials have a 20-year warranty; HPL and HDPE materials are covered for 10 years.For more information, feel free to browse our Solutions page.

Do you offer custom-designed or personalized playground solutions?

Yes. Under our CMR IDEA brand, our team of landscape architects, engineers, and designers at the Cemer Design Center develop bespoke playground solutions tailored to your specific requirements. We offer the opportunity for close collaboration with our R&D team throughout the entire design and production process.

Are your products compliant with safety standards?

Yes. All of our playground equipment is designed and manufactured in accordance with current national and international safety standards (ASTM, EN). During the planning phase, all safety parameters—including surfacing and fall height calculations—are thoroughly evaluated by our R&D department.

What is the delivery time ?

Delivery timelines vary depending on the order specifications and the overall scope of the project. While standard items in stock can be delivered more quickly, custom-designed projects typically require a lead time of 4 to 8 weeks. A detailed project schedule is discussed and confirmed with you during the proposal stage.

Do you provide spare parts ?

Yes, we offer lifetime spare parts support across all our product categories. Our logistics team ensures that the requested components are delivered to your location worldwide in the shortest possible time.